Logo
    • Education
      • Pre-School
      • Primary Schools Directory
      • Primary Schools Articles
      • P1 Registration
      • DSA
      • PSLE
      • Secondary
      • Tertiary
      • Special Needs
    • Lifestyle
      • Well-being
    • Activities
      • Events
    • Enrichment & Services
      • Find A Service Provider
      • Enrichment Articles
      • Enrichment Services
      • Tuition Centre/Private Tutor
      • Infant Care/ Childcare / Student Care Centre
      • Kindergarten/Preschool
      • Private Institutions and International Schools
      • Special Needs
      • Indoor & Outdoor Playgrounds
      • Paediatrics
      • Neonatal Care
    • Forum
    • ASKQ
    • Register
    • Login

    Secondary 3 E-learning Maths question

    Scheduled Pinned Locked Moved Tertiary Education - A-Levels, Diplomas, Degrees
    5 Posts 3 Posters 1.5k Views 1 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • B Offline
      bluesky63
      last edited by

      Hi all Maths guru,


      there is a sec3 maths qns (elearning) that I don't understd the steps and working given . The questions is below, I seek somebody who can provide me with easy explaination

      Question

      Mrs Tan takes 1 day more to finish marking the mathematics exam papers of all the 36 students in her class as compared to Mr Wong. If Mrs Tan marked the papers together with Mr Wong, both of them would complete the marking in 2 days. Find the time, in minutes, Mr Wong would take to mark a paper alone. Correct your answer to 3 sigificant figures

      [A] 142 mins [B] 22.5 mins [C] 121 mins [D] 41.0 min

      1 Reply Last reply Reply Quote 0
      • N Offline
        n00bin4t0r
        last edited by

        All these are in rates (no of papers marked) per hour.

        Let x be the number of days Wong takes to mark 36 papers.
        Wong’s rate = 36/x
        Tan’s rate = 36/(x+1)
        Combined rate = (72x+36)/(x(x+1))
        Combined duration = 2
        Combined duration = 36/Combine rate
        36/Combined rate = 2
        … solve for x, remember to reject non-logical answers if there are 2 solution
        Answer = x/36 (in papers per days) = ??? (in papers per minute)

        I’m sure there are many ways to do this, but here’s my thought process.
        I have to find Wong’s rate, so I let it be x.
        Then, I have to get an equation where x is the only unknown so I can solve it.
        A quick scan through & by gut feeling, its the equation that equates to 2.
        So, I need the left-hand-side of that equation, the combined duration which requires the combined rate which in turn requires the individual rates of Tan & Wong.
        So, I express Tan & Wong’s rate in x, substitute to get their combined rate, then substitute to get combined duration and solve for x

        1 Reply Last reply Reply Quote 0
        • B Offline
          bluesky63
          last edited by

          Hi

          Thanks, l will try it out 🙂

          n00bin4t0r:
          All these are in rates (no of papers marked) per hour.
          Let x be the number of days Wong takes to mark 36 papers.
          Wong's rate = 36/x
          Tan's rate = 36/(x+1)
          Combined rate = (72x+36)/(x(x+1))
          Combined duration = 2
          Combined duration = 36/Combine rate
          36/Combined rate = 2
          ... solve for x, remember to reject non-logical answers if there are 2 solution
          Answer = x/36 (in papers per days) = ??? (in papers per minute)

          I'm sure there are many ways to do this, but here's my thought process.
          I have to find Wong's rate, so I let it be x.
          Then, I have to get an equation where x is the only unknown so I can solve it.
          A quick scan through & by gut feeling, its the equation that equates to 2.
          So, I need the left-hand-side of that equation, the combined duration which requires the combined rate which in turn requires the individual rates of Tan & Wong.
          So, I express Tan & Wong's rate in x, substitute to get their combined rate, then substitute to get combined duration and solve for x

          1 Reply Last reply Reply Quote 0
          • F Offline
            FrekiWang
            last edited by

            one day may not/should not be 24hour x 60min, not realistic

            1 Reply Last reply Reply Quote 0

            Hello! It looks like you're interested in this conversation, but you don't have an account yet.

            Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.

            With your input, this post could be even better 💗

            Register Login
            • 1 / 1
            • First post
              Last post



            Online Users

            Recent Topics
            New to the KiasuParents forum? Tips and Tricks!
            How do you maintain your relationship with your spouse?
            Budgeting for tougher times ahead. What's yours?
            SkillsFuture + anything related to upskilling/learning something new!
            My girl keeps locking her door. And I don't like it
            How much do you spend on the kids' tuition/enrichments?
            DSA 2026
            PSLE Discussions and Strategies

            Statistics

            0

            Online

            210.6k

            Users

            34.1k

            Topics

            1.8m

            Posts
              About Us Contact Us forum Terms of Service Privacy Policy