Logo
    • Education
      • Pre-School
      • Primary Schools Directory
      • Primary Schools Articles
      • P1 Registration
      • DSA
      • PSLE
      • Secondary
      • Tertiary
      • Special Needs
    • Lifestyle
      • Well-being
    • Activities
      • Events
    • Enrichment & Services
      • Find A Service Provider
      • Enrichment Articles
      • Enrichment Services
      • Tuition Centre/Private Tutor
      • Infant Care/ Childcare / Student Care Centre
      • Kindergarten/Preschool
      • Private Institutions and International Schools
      • Special Needs
      • Indoor & Outdoor Playgrounds
      • Paediatrics
      • Neonatal Care
    • Forum
    • Register
    • Login

    Q&A - PSLE Math

    Scheduled Pinned Locked Moved Primary 6 & PSLE
    9.3k Posts 673 Posters 4.2m Views 1 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • ozoraO
      ozora
      last edited by

      tianzhu:
      ozora:

      Need help to identify the number pattern below and find the missing

      Number.

      4, 6, 8, 12, 24, 36, ___,144, 480

      Hi

      The missing number is 96.

      4*2 ----- 8
      6*2 ----- 12
      8*3 ------ 24
      12*3 ----- 36
      24*4 ------ 96
      36*4 ------ 144
      96*5 ------ 480

      Hope this helps

      Best wishes

      thanks. Really stuck.:)

      1 Reply Last reply
      Reply Quote 0
      • O
        Oldschool
        last edited by

        Hi,


        BTW, forum admins/mopderators might want to shift this thread under the relevant topics or header.

        To begin,

        (1) To complete the drawing,

        Gogh + Picasso => 4 days, follow by
        Picasso => 5 days

        (2) Per day, G - P = 1/30 of the drawings

        or G = P + 1/30

        (3) Therefore, per day,

        Gogh + Picasso complete => P + 1/30 + P of the drawings

        4 days of (G + P) => 8P + 2/15
        5 days of P => 5P

        (4) 8P + 2/15 + 5P = 1 complete drawing

        then P = 1/15
        and G = 1/10

        (5) Hence, Gogh will take 10 days whereas Picasso will take 15 days to completes the drawing alone.

        Regards

        1 Reply Last reply
        Reply Quote 0
        • O
          Oldschool
          last edited by

          Hi,


          (1) 2 teams will take 30 days to complete.

          Then, 30 days => 100%

          So, in 6 days, the 2 teams completed => 100/30 x 6 = 20%

          (2) Therefore, left with 80% which was completed by a single team in 40 days.

          80% => 40 days
          100% => 50 days

          (3) Assume that both teams are equally hardworking. Then it would take 50 days for a single team to complete that certain job.

          Regards

          1 Reply Last reply
          Reply Quote 0
          • MathIzzzFunM
            MathIzzzFun
            last edited by

            Oldschool:
            Hi,


            (1) 2 teams will take 30 days to complete.

            Then, 30 days => 100%

            So, in 6 days, the 2 teams completed => 100/30 x 6 = 20%

            (2) Therefore, left with 80% which was completed by a single team in 40 days.

            80% => 40 days
            100% => 50 days

            (3) Assume that both teams are equally hardworking. Then it would take 50 days for a single team to complete that certain job.

            Regards
            the two team worked at different rate.

            Total amount of work to be done --> 30 units (1 day = 1unit of work)

            In 6 days, 6 units completed, 24 units left.

            Team A (team remained to complete the work) takes 40 days to complete 24 units of work --> 24/40 unit/day = 0.6 unit/day

            Team B --> (1 - 0.6) unit/day = 0.4unit /day

            Number of days taken by each team to complete all the work by itself:
            Team A --> 30/0.6 = 50 days
            Team B --> 30/0.4 = 75 days

            cheers.

            1 Reply Last reply
            Reply Quote 0
            • O
              Oldschool
              last edited by

              MathIzzzFun:
              Oldschool:

              Hi,


              (1) 2 teams will take 30 days to complete.

              Then, 30 days => 100%

              So, in 6 days, the 2 teams completed => 100/30 x 6 = 20%

              (2) Therefore, left with 80% which was completed by a single team in 40 days.

              80% => 40 days
              100% => 50 days

              (3) Assume that both teams are equally hardworking. Then it would take 50 days for a single team to complete that certain job.

              Regards

              the two team worked at different rate.

              Total amount of work to be done --> 30 units (1 day = 1unit of work)

              In 6 days, 6 units completed, 24 units left.

              Team A (team remained to complete the work) takes 40 days to complete 24 units of work --> 24/40 unit/day = 0.6 unit/day

              Team B --> (1 - 0.6) unit/day = 0.4unit /day

              Number of days taken by each team to complete all the work by itself:
              Team A --> 30/0.6 = 50 days
              Team B --> 30/0.4 = 75 days

              cheers.


              Nice.

              1 Reply Last reply
              Reply Quote 0
              • M
                mathnoobs
                last edited by

                MathIzzzFun:
                Oldschool:

                Hi,


                (1) 2 teams will take 30 days to complete.

                Then, 30 days => 100%

                So, in 6 days, the 2 teams completed => 100/30 x 6 = 20%

                (2) Therefore, left with 80% which was completed by a single team in 40 days.

                80% => 40 days
                100% => 50 days

                (3) Assume that both teams are equally hardworking. Then it would take 50 days for a single team to complete that certain job.

                Regards

                the two team worked at different rate.

                Total amount of work to be done --> 30 units (1 day = 1unit of work)

                In 6 days, 6 units completed, 24 units left.

                Team A (team remained to complete the work) takes 40 days to complete 24 units of work --> 24/40 unit/day = 0.6 unit/day

                Team B --> (1 - 0.6) unit/day = 0.4unit /day

                Number of days taken by each team to complete all the work by itself:
                Team A --> 30/0.6 = 50 days
                Team B --> 30/0.4 = 75 days

                cheers.

                could someone post the question to this answer ? it would be useful.

                1 Reply Last reply
                Reply Quote 0
                • S
                  superksmum
                  last edited by

                  Can someone pls help with this question:


                  Leslie bought some sweets and gave 2/3 of it to Alan. Alan bought some chocolates and gave 2/3 of it to Leslie. Leslie ate 6 chocolates and Alan ate 6 sweets. The ratio of Leslie’s chocolates to sweets became 2:1 and the ratio of Alan’s chocolates to sweets became 4:5. How many sweets did Leslie buy?

                  Thanks

                  1 Reply Last reply
                  Reply Quote 0
                  • K
                    KiausuLormee
                    last edited by

                    Can somebody help to solve this question:

                    The ratio of the number of pineapple tarts to the number of almond cookies that Mrs Mohan baked was 3:5.She baked 0.8 as many cheese cakes as pineapple tarts.
                    (a) What was the ratio of the number of almond cookies to the number if cheese cakes that she baked?
                    (b) If she sold 17 almond cookies and baked another 15 cheese cakes, she would have 20 more almond cookies than cheese cakes. How many pineapple tarts did she bake?

                    1 Reply Last reply
                    Reply Quote 0
                    • MathIzzzFunM
                      MathIzzzFun
                      last edited by

                      mathnoobs:
                      MathIzzzFun:

                      [quote=\"Oldschool\"]Hi,


                      (1) 2 teams will take 30 days to complete.

                      Then, 30 days => 100%

                      So, in 6 days, the 2 teams completed => 100/30 x 6 = 20%

                      (2) Therefore, left with 80% which was completed by a single team in 40 days.

                      80% => 40 days
                      100% => 50 days

                      (3) Assume that both teams are equally hardworking. Then it would take 50 days for a single team to complete that certain job.

                      Regards



                      Two teams had to complete a certain job in 30days. 6 days after they started the job, one team was transferred to another zone while the other continued working alone and completed the remaining part of the job in 40 days. In how many days could each team,working separately, complete the whole job.


                      the two team worked at different rate.

                      Total amount of work to be done --> 30 units (1 day = 1unit of work)

                      In 6 days, 6 units completed, 24 units left.

                      Team A (team remained to complete the work) takes 40 days to complete 24 units of work --> 24/40 unit/day = 0.6 unit/day

                      Team B --> (1 - 0.6) unit/day = 0.4unit /day

                      Number of days taken by each team to complete all the work by itself:
                      Team A --> 30/0.6 = 50 days
                      Team B --> 30/0.4 = 75 days

                      cheers.

                      could someone post the question to this answer ? it would be useful.[/quote]

                      1 Reply Last reply
                      Reply Quote 0
                      • MathIzzzFunM
                        MathIzzzFun
                        last edited by

                        superksmum:
                        Can someone pls help with this question:


                        Leslie bought some sweets and gave 2/3 of it to Alan. Alan bought some chocolates and gave 2/3 of it to Leslie. Leslie ate 6 chocolates and Alan ate 6 sweets. The ratio of Leslie's chocolates to sweets became 2:1 and the ratio of Alan's chocolates to sweets became 4:5. How many sweets did Leslie buy?

                        Thanks
                        after Leslie gave 2/3 of the sweets to Alan and Alan gave 2/3 of the chocolates to Leslie,
                        Leslie had 2/3 of the chocolates and 1/3 of the sweets
                        Alan had 1/3 of chocolates and 2/3 of the sweets

                        Leslie's chocolates : sweets --> 2u + 6 : 1u
                        Alan's chocolates : sweets --> 1u + 3 : 2u

                        After Alan ate 6 sweets,
                        Alan's chocolates : sweets
                        --> 1u + 3 : 2u - 6
                        = 4 : 5

                        cross-multiply/equalize:
                        5u + 15 = 8u - 24
                        1u --> 13

                        Number of sweets Leslie bought --> 3u --> 39

                        cheers.

                        1 Reply Last reply
                        Reply Quote 0

                        Hello! It looks like you're interested in this conversation, but you don't have an account yet.

                        Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.

                        With your input, this post could be even better 💗

                        Register Login
                        • 1
                        • 2
                        • 878
                        • 879
                        • 880
                        • 881
                        • 882
                        • 931
                        • 932
                        • 880 / 932
                        • First post
                          Last post



                        Online Users

                        Statistics

                        13

                        Online

                        211.5k

                        Users

                        34.6k

                        Topics

                        1.8m

                        Posts
                        Apps Shared on Our Forum

                        Maths

                        Ruiya.ai
                        math support
                        →
                        Tallytide
                        P1-P6 maths app
                        →
                        MugCorner
                        Sec 1-4 maths practice
                        →

                        English

                        tutor.agenticolab.com
                        P1-6 English portal
                        →
                        wordwizards.sg
                        English practice
                        →
                        Ashton English
                        P4-Sec 4 English practice
                        →

                        Chinese

                        chinese.getbuzzi.com
                        P1-P6 Chinese
                        →
                        Wonder Chinese
                        P1-P6 Chinese writing
                        →
                        Xiaozhu Free trial
                        Mandarin chat buddy
                        →

                        Multiple subjects

                        Pickytic.ai
                        AI study buddy for pri and sec
                        →

                          About Us Contact Us global:forum Terms of Service Privacy Policy