zac's mum\" post_id=\"2007197\" time=\"1607397633\" user_id=\"53606:[quote=\"zac's mum\" post_id=2007197 time=1607397633 user_id=53606]
New HiHi\" post_id=\"2006179\" time=\"1606787606\" user_id=\"186762:[quote=\"New HiHi\" post_id=2006179 time=1606787606 user_id=186762]N-S highway major construction cutting into PHS' compound. Maybe very noisy and dusty over the next few years.
Is that affecting the campus a lot? This is not positive information for this year S1 posting:)[/quote]
I happened to be near that area today and drove by to take a look. There's an entire area in front of the school's main gate that has been hoarded up for the NSC construction. Also behind the school, a substantial corner plot of land looks like it has been carved out of the school compound and hoarded up.
While it is true the NSC is underground, but still the massive construction equipment needs to be sited on current land plots, so that the tunnelling can take place and be monitored from those entry points. Maybe once the NSC is fully completed in 2026 the school will get the corner plot of land returned to it.
I believe it is still a good Christian co-ed school. If can bear with the pounding noise and dust, the school is actually an ultra convenient quick walk from YCK MRT station. Of course for personal reasons I would hope the demand goes down so that the COP also goes down.[/quote]You're correct. As shared by phtthp, PHS COP for 2020 remains the same as previous year for Express stream while those for NA and NT stream rose slightly. Perhaps if not for the massive construction, the COP may even be higher. Are you surprised?