O-Level Additional Math
-
Thank you very much, u r fast!
-
Hi jie heng
Can show how you derive at the above answers?
Thanks! -
Hi,
Could you help me solve part ii of the following question?
A polynomial p(x) when divided by (x^2 - 1) leaves a quadratic remainder with no remainder. The constant term in p(x) is 10.
Given that p(x) leaves a remainder of 630 and 112 when divided by (x - 4) and (x + 3) respectively, find
i) an expression for p(x) in descending powers of x.
ii) solutions when p(x) = x^2 - x + 10
Ans: i) 3x^4 + x^3 - 13x^2 - x + 10
ii) x = 0, -7/3, 2 -
1. A number is a called palindrome if it reads the same from left and from right. example 130031 is a palindrome. writing all palindroms we get 1,2,3,4,5,…9,11,22,…what is the 2007th palindrome. do you have formula to find the nth palindrome.
please help -
tutor4kids:
I assume 'quadratic remainder' is an error and it should be 'quadratic quotient'.Hi,
Could you help me solve part ii of the following question?
A polynomial p(x) when divided by (x^2 - 1) leaves a quadratic remainder with no remainder. The constant term in p(x) is 10.
Given that p(x) leaves a remainder of 630 and 112 when divided by (x - 4) and (x + 3) respectively, find
i) an expression for p(x) in descending powers of x.
ii) solutions when p(x) = x^2 - x + 10
Ans: i) 3x^4 + x^3 - 13x^2 - x + 10
ii) x = 0, -7/3, 2
(i)
p(x) = Divisor x Quatient + Remainder = (x^2 -1)(ax^2+bx+c)+0 = ax^4 +bx^3 + cx^2 -ax^2 - bx - c = ax^4 + bx^3 + (c-a)x^2 - bx - c
Since the constant term is 10, we have -c = 10, c = -10
Thus, p(x)=ax^4 + bx^3 + (-10-a)x^2 - bx + 10
According to the remainder thereom,
p(4)=630 and p(-3)=112
256a+64b+16(-10-a)-4b+10=630 and 81a-27b+9(-10-a)+3b+10=112
240a+60b=780 and 72a-24b=192
solve, we get a=3 and b=1
therefore p(x)= 3x^4 + x^3 -13x^2 - x + 10
(ii) p(x)=x^2 - x + 10
3x^4 + x^3 - 13x^2 - x +10 = x^2 - x + 10
3x^4 + x^3 - 14x^2 = 0
x^2(3x^2 + x - 14) = 0
x^2(3x + 7)(x - 2) = 0
x^2 = 0 or 3x + 7 = 0 or x - 2 = 0
x = 0 or x = -7/3 or x = 2
PS: You may need more systematic help for this chapter, not just Q&A -
leeven:
First of all, I do not believe this is a secondary school question. The standard of this problem is for competition at upper secondary school level, e.g. SMO (Senior)1. A number is a called palindrome if it reads the same from left and from right. example 130031 is a palindrome. writing all palindroms we get 1,2,3,4,5,....9,11,22,,....what is the 2007th palindrome. do you have formula to find the nth palindrome.
please help
So, here is my solution, assuming you have some basic knowledge about competition mathematics.
There are 9 1-digit palindroms.
There are 9 2-digit palindroms.
For 3-digit palindroms. You can choose a number from 0 to 9 (10numbers here) and insert into a 2-digit palindrom to form a 3-digit palindrom. Therefore 9 2-digit palindroms can produce 9 x 10 = 90 3-digit palindroms.
For 4-digit palindroms. You can choose a number from 00, 11 to 99(10numbers here) and insert into a 2-digit palindrom to form a 4-digit palindrom.
Therefore 9 2-digit palindroms can produce 9 x 10 = 90 4-digt palindroms.
Similarly, insert a number from 0 ... 9 into a 4-digit palindrom to form a 5-digit palindroms, there are 90 x 10 = 900 of them.
Insert a number from 00 ... 99 into a 4-digit palindrom to form a 6-digit palindroms, there are 90 x 10 = 900 of them.
Now we have 9 + 9 + 90 + 90 + 900 + 900 = 1998 palindroms in totoal, we need 9 more.
Let's start counting the 7-digit palindroms from the least: (inserting 0..9 into 100001)
1000001, 1001001, 1002001, 1003001, 1004001, 1005001, 1006001, 1007001, 1008001 - this is the 9th, so the answer is 1008001. -
hi how to solve this qqn
a team of 8 men can build 3 swimming pools in 5 weeks. Find the no. Of men required to build 6 swimming pools in 4 weeks? Tq -
Herbie:
Hihi how to solve this qqn
a team of 8 men can build 3 swimming pools in 5 weeks. Find the no. Of men required to build 6 swimming pools in 4 weeks? Tq
One way is to use compound units which in this question is \"man-weeks\"
3 swimming pool ------ 8*5 ------ 40 man-weeks
6 swimming pools ------ 2*40 ------- 80 man-weeks
80/4 ------ 20 men
Best wishes -
hi tianzhu, many thanks!
I hv another qn.
15 men working 8 hours a day can build a bridge in 30 days.
How long will 9 men working 8 hours a day take to buiild the same ridge assuming that the rate at which they work remains unchanged? My ans is 50 days.
B. How many hours a day must 25 men work to build the same bridhe in 16 days!
Tq -
Herbie:
Hi
15 men working 8 hours a day can build a bridge in 30 days.
How long will 9 men working 8 hours a day take to buiild the same ridge assuming that the rate at which they work remains unchanged? My ans is 50 days.
B. How many hours a day must 25 men work to build the same bridhe in 16 days!
Your answer of 50 days for part A is right.
For part B,
1 bridge ------ 15*30*8 ------- 3600 man-hours
Number of men*number of days*number of hours ------- 3600 man-hours
25*16*h ------- 3600 where h refers to the number of hours the men must work.
h ------- 9 hours.
Best wishes
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗
Register Login