Nanyang Primary
-
lovinglife:
that was actually belonging to NYPS but used by NYK while NYK was rebuilding their campus. after NYK moved back to their new building, they are lazy to remove the NYK signboard since they are going to demolish that place to build new facilities for NYPSOops, I just gotten my answer

The student care is located at 4th floor Nanyang Kindergarten. -
verykiasu2010:
that was actually belonging to NYPS but used by NYK while NYK was rebuilding their campus. after NYK moved back to their new building, they are lazy to remove the NYK signboard since they are going to demolish that place to build new facilities for NYPS
Is the school going to build a swimming pool?
My DS will be starting his 1st yr in Toh Tuck and hopefully subsequent years back to original premises. -
lovinglife:
the construction will take two years, so your DS should be back for pri 3, and will be in time to celebrate the 100th anniversary of the schoolverykiasu2010:
that was actually belonging to NYPS but used by NYK while NYK was rebuilding their campus. after NYK moved back to their new building, they are lazy to remove the NYK signboard since they are going to demolish that place to build new facilities for NYPS
Is the school going to build a swimming pool?
My DS will be starting his 1st yr in Toh Tuck and hopefully subsequent years back to original premises.
there will be swimming pool, gymnasium, but not sure if there is a roof top tennis court -
verykiasu2010:
My DS is only entering P1 in 2014. How long is he going to study in Toh Tuck?
the construction will take two years, so your DS should be back for pri 3, and will be in time to celebrate the 100th anniversary of the school
there will be swimming pool, gymnasium, but not sure if there is a roof top tennis court -
lovinglife:
construction to complete by end of 2014
My DS is only entering P1 in 2014. How long is he going to study in Toh Tuck?verykiasu2010:
the construction will take two years, so your DS should be back for pri 3, and will be in time to celebrate the 100th anniversary of the school
there will be swimming pool, gymnasium, but not sure if there is a roof top tennis court -
verykiasu2010:
the construction will take two years, so your DS should be back for pri 3, and will be in time to celebrate the 100th anniversary of the schoollovinglife:
[quote=\"verykiasu2010\"]that was actually belonging to NYPS but used by NYK while NYK was rebuilding their campus. after NYK moved back to their new building, they are lazy to remove the NYK signboard since they are going to demolish that place to build new facilities for NYPS
Is the school going to build a swimming pool?
My DS will be starting his 1st yr in Toh Tuck and hopefully subsequent years back to original premises.
there will be swimming pool, gymnasium, but not sure if there is a roof top tennis court[/quote]Wow! Not many primary schools have their own s/pool ! -
verykiasu2010:
There is no mentioning of swimming pool leh...
there will be swimming pool, gymnasium, but not sure if there is a roof top tennis court
http://www.nyps.moe.edu.sg/building/nyps%20website%20v5/nypsbuildingproj_020.htm
...unless you are going to donate one...a full Olympic size one?? :evil: -
BigDevil:
There is no mentioning of swimming pool leh...verykiasu2010:
there will be swimming pool, gymnasium, but not sure if there is a roof top tennis court
http://www.nyps.moe.edu.sg/building/nyps%20website%20v5/nypsbuildingproj_020.htm
...unless you are going to donate one...a full Olympic size one?? :evil:
may be my info not updated. the previous fund raising dinner we attended still mentioned about it..ok that was last year
but why they want to integrate the kindy in the same place ? the traffic and noise are at different timing, quite disruptive, and the kindy has their new building at King's Road next to the church already wat ..... -
lovinglife:
Only for one year. The construction will be completed by end of 2014.
My DS is only entering P1 in 2014. How long is he going to study in Toh Tuck?verykiasu2010:
the construction will take two years, so your DS should be back for pri 3, and will be in time to celebrate the 100th anniversary of the school
there will be swimming pool, gymnasium, but not sure if there is a roof top tennis court -
Those in P4 this year will have to bear with the construction noise and inconvenience for the next 2 years. By the time it is ready, it is also time for them to leave the school. So sad…
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗
Register Login